Input validation
Check model versions, coordinates, discipline coverage and agreed review rules.
Model-based conflict review that turns potential clashes into clear, reviewable coordination issues.

Clash detection is most useful when the review scope and tolerances are agreed and the results are filtered into actionable issues. Not every geometric intersection is a constructability problem.
Check model versions, coordinates, discipline coverage and agreed review rules.
Run agreed hard-clash, clearance or interface checks using project-specific rules and tolerances.
Review duplicates, intentional intersections and low-value results so the team can focus on meaningful issues.
Prepare issue records with location, viewpoints, descriptions and responsible parties in the agreed format.
To assess a request, share the project type and location, available drawings or models, disciplines, required outputs, target dates and any BIM execution or submission requirements.
Send project details ↗No. Automated checks can produce false positives and intentional intersections. Results need human review against design intent, installation requirements and project tolerances.
Scope, assumptions, exclusions, deliverables and review responsibilities are agreed before any production work begins.
Send your project brief for an initial scope discussion.